ci: use 8 parallel jobs for the integration test suite
authorTim-Philipp Müller <tim@centricular.com>
Mon, 7 Nov 2022 18:29:52 +0000 (18:29 +0000)
committerGStreamer Marge Bot <gitlab-merge-bot@gstreamer-foundation.org>
Tue, 8 Nov 2022 18:02:39 +0000 (18:02 +0000)
The runners have a lower core count than the previous
generation so the integration tests run much slower
overall than the used to, so fix that by running more
in parallel again. The build time is measured in seconds
and much faster than it used to be, so should still be
a reasonable trade-off, and means re-tried jobs will
complete faster.

Part-of: <https://gitlab.freedesktop.org/gstreamer/gstreamer/-/merge_requests/3354>

.gitlab-ci.yml

index 24d6713..855abba 100644 (file)
@@ -507,7 +507,7 @@ check fedora:
 
 integration testsuites fedora:
   extends: '.test fedora x86_64'
-  parallel: 4
+  parallel: 8
   variables:
     EXTRA_VALIDATE_ARGS: "--timeout-factor=2 --retry-on-failures --parts=${CI_NODE_TOTAL} --part-index=${CI_NODE_INDEX} --sync"
     TEST_SUITE: "validate ges"