1 curl release procedure - how to do a release
2 ============================================
3
4 in the source code repo
5 -----------------------
6
7 - edit `RELEASE-NOTES` to be accurate
8
9 - update `docs/THANKS`
10
11 - make sure all relevant changes are committed on the master branch
12
13 - tag the git repo in this style: `git tag -a curl-7_34_0`. -a annotates the
14   tag and we use underscores instead of dots in the version number.
15
16 - run "./maketgz 7.34.0" to build the release tarballs. It is important that
17   you run this on a machine with the correct set of autotools etc installed
18   as this is what then will be shipped and used by most users on *nix like
19   systems.
20
21 - push the git commits and the new tag
22
23 - gpg sign the 4 tarballs as maketgz suggests
24
25 - upload the 8 resulting files to the primary download directory
26
27 in the curl-www repo
28 --------------------
29
30 - edit `Makefile` (version number and date),
31
32 - edit `_newslog.html` (announce the new release) and
33
34 - edit `_changes.html` (insert changes+bugfixes from RELEASE-NOTES)
35
36 - commit all local changes
37
38 - tag the repo with the same tag as used for the source repo
39
40 - make sure all relevant changes are committed and pushed on the master branch
41
42   (the web site then updates its contents automatically)
43
44 inform
45 ------
46
47 - send an email to curl-users, curl-announce and curl-library. Insert the
48   RELEASE-NOTES into the mail.
49
50 celebrate
51 ---------
52
53 - suitable beverage intake is encouraged for the festivities
54
55 curl release scheduling
56 =======================
57
58 Basics
59 ------
60
61 We do releases every 8 weeks on Wednesdays. If critical problems arise, we can
62 insert releases outside of the schedule or we can move the release date - but
63 this is very rare.
64
65 Each 8 week release cycle is split in two 4-week periods.
66
67 - During the first 4 weeks after a release, we allow new features and changes
68   to curl and libcurl. If we accept any such changes, we bump the minor number
69   used for the next release.
70
71 - During the second 4-week period we do not merge any features or changes, we
72   then only focus on fixing bugs and polishing things to make a solid coming
73   release.
74
75 Coming dates
76 ------------
77
78 Based on the description above, here are some planned release dates (at the
79 time of this writing):
80
81 - October 7, 2015 (version 7.45.0)
82 - December 2, 2015
83 - January 27, 2016
84 - March 23, 2016
85 - May 18, 2016