summary |
shortlog | log |
commit |
commitdiff |
tree
first ⋅ prev ⋅ next
Hermet Park [Sat, 18 Apr 2020 04:48:37 +0000 (13:48 +0900)]
sw_engine: implement line and curve raster
Change-Id: I22a77892544cd510cfe646aee60093cebb848806
Hermet Park [Sat, 18 Apr 2020 03:43:30 +0000 (12:43 +0900)]
replace backend class names.
SwRaster to SwEngine
GlRaster to GlEngine
Change-Id: I3cf70e168b78c64754807a62c221e13c11b95c35
Hermet Park [Tue, 14 Apr 2020 17:11:18 +0000 (02:11 +0900)]
implement rle path parts.
Change-Id: I7200d80320404d6e7fb722042b8f330961bee76d
Hermet Park [Sat, 11 Apr 2020 06:23:37 +0000 (15:23 +0900)]
implement rle raster.
Change-Id: Ie21dfbf0ff1aed43bfa750eeef3b8c033a986416
Hermet Park [Fri, 3 Apr 2020 16:14:11 +0000 (01:14 +0900)]
implement shape basics sw engine.
Change-Id: I93788f40f7c4f59bcc9ab4dff9127bcb4e6c1466
Hermet Park [Fri, 3 Apr 2020 07:09:09 +0000 (16:09 +0900)]
implement sw engine basic sequence.
Change-Id: Ide27c9b191088109f95e03fcd1c80ad3ecc058cd
Hermet Park [Wed, 1 Apr 2020 10:48:37 +0000 (19:48 +0900)]
implement basic interfaces
major functions are added for Path specification.
added backend engine infra skeleton.
Change-Id: Ia923b02649cff545fa768ab8538ad7187195826f
Hermet Park [Mon, 30 Mar 2020 11:51:26 +0000 (20:51 +0900)]
Update sample prototypes.
This is still a hard work and under the intensive settle up stage.
Change-Id: Ibfbeaabe8a51dc5edeeccf8fe75e65e60b91f703
Hermet Park [Wed, 25 Mar 2020 04:54:29 +0000 (13:54 +0900)]
build up base infra code for prototype.
Change-Id: I117a798caf4d9fedfe5c467471dee2f0150c2630
Hermet Park [Tue, 24 Mar 2020 06:07:51 +0000 (15:07 +0900)]
+ Initial draft
Introduce project skeleton such as build envrionment and interfaces
to build up code further cooperatively.
Change-Id: Ie9ac38991f609d33637283134906d7cc3f2ac19e
Tizen Infrastructure [Tue, 24 Mar 2020 02:52:35 +0000 (02:52 +0000)]
Initial empty repository