Sometimes updates to the farm config are needed before re-enabling it,
or updating test expectations with new failures that happened while the
farm was down, etc.
These need to be allowed, as the alternative is to update the
config/expectations/etc. blindly in one MR, merge it, and then merge
another MR with the farm re-enablement.
Part-of: <https://gitlab.freedesktop.org/mesa/mesa/-/merge_requests/25560>
---------------
.. note::
- Never mix farm maintenance with any other change in the same merge request!
+ Never mix disabling/re-enabling a farm with any change that can affect a job
+ that runs in another farm!
When the farm starts failing for any reason (power, network, out-of-space), it needs to be disabled by pushing separate MR with