[ Upstream commit
665e7d83c5386f9abdc67b2e4b6e6d9579aadfcb ]
Commit
c87c938f62d8f1 ("i40e: Add VF VLAN pruning") added new
PF flag I40E_FLAG_VF_VLAN_PRUNING but its value collides with
existing I40E_FLAG_TOTAL_PORT_SHUTDOWN_ENABLED flag.
Move the affected flag at the end of the flags and fix its value.
Reproducer:
[root@cnb-03 ~]# ethtool --set-priv-flags enp2s0f0np0 link-down-on-close on
[root@cnb-03 ~]# ethtool --set-priv-flags enp2s0f0np0 vf-vlan-pruning on
[root@cnb-03 ~]# ethtool --set-priv-flags enp2s0f0np0 link-down-on-close off
[ 6323.142585] i40e 0000:02:00.0: Setting link-down-on-close not supported on this port (because total-port-shutdown is enabled)
netlink error: Operation not supported
[root@cnb-03 ~]# ethtool --set-priv-flags enp2s0f0np0 vf-vlan-pruning off
[root@cnb-03 ~]# ethtool --set-priv-flags enp2s0f0np0 link-down-on-close off
The link-down-on-close flag cannot be modified after setting vf-vlan-pruning
because vf-vlan-pruning shares the same bit with total-port-shutdown flag
that prevents any modification of link-down-on-close flag.
Fixes: c87c938f62d8 ("i40e: Add VF VLAN pruning")
Cc: Mateusz Palczewski <mateusz.palczewski@intel.com>
Cc: Simon Horman <horms@kernel.org>
Signed-off-by: Ivan Vecera <ivecera@redhat.com>
Reviewed-by: Jacob Keller <jacob.e.keller@intel.com>
Tested-by: Pucha Himasekhar Reddy <himasekharx.reddy.pucha@intel.com> (A Contingent worker at Intel)
Signed-off-by: David S. Miller <davem@davemloft.net>
Signed-off-by: Sasha Levin <sashal@kernel.org>
#define I40E_FLAG_DISABLE_FW_LLDP BIT(24)
#define I40E_FLAG_RS_FEC BIT(25)
#define I40E_FLAG_BASE_R_FEC BIT(26)
-#define I40E_FLAG_VF_VLAN_PRUNING BIT(27)
/* TOTAL_PORT_SHUTDOWN
* Allows to physically disable the link on the NIC's port.
* If enabled, (after link down request from the OS)
* in abilities field of i40e_aq_set_phy_config structure
*/
#define I40E_FLAG_TOTAL_PORT_SHUTDOWN_ENABLED BIT(27)
+#define I40E_FLAG_VF_VLAN_PRUNING BIT(28)
struct i40e_client_instance *cinst;
bool stat_offsets_loaded;