[PATCH] sched: move load-calculation functions
authorIngo Molnar <mingo@elte.hu>
Thu, 2 Aug 2007 15:41:40 +0000 (17:41 +0200)
committerIngo Molnar <mingo@elte.hu>
Thu, 2 Aug 2007 15:41:40 +0000 (17:41 +0200)
move load-calculation functions so that they can use the per-policy
declarations and methods.

Signed-off-by: Ingo Molnar <mingo@elte.hu>
kernel/sched.c

index 915c75e..a9d3740 100644 (file)
@@ -678,46 +678,6 @@ static void update_load_sub(struct load_weight *lw, unsigned long dec)
        lw->inv_weight = 0;
 }
 
-static void __update_curr_load(struct rq *rq, struct load_stat *ls)
-{
-       if (rq->curr != rq->idle && ls->load.weight) {
-               ls->delta_exec += ls->delta_stat;
-               ls->delta_fair += calc_delta_fair(ls->delta_stat, &ls->load);
-               ls->delta_stat = 0;
-       }
-}
-
-/*
- * Update delta_exec, delta_fair fields for rq.
- *
- * delta_fair clock advances at a rate inversely proportional to
- * total load (rq->ls.load.weight) on the runqueue, while
- * delta_exec advances at the same rate as wall-clock (provided
- * cpu is not idle).
- *
- * delta_exec / delta_fair is a measure of the (smoothened) load on this
- * runqueue over any given interval. This (smoothened) load is used
- * during load balance.
- *
- * This function is called /before/ updating rq->ls.load
- * and when switching tasks.
- */
-static void update_curr_load(struct rq *rq, u64 now)
-{
-       struct load_stat *ls = &rq->ls;
-       u64 start;
-
-       start = ls->load_update_start;
-       ls->load_update_start = now;
-       ls->delta_stat += now - start;
-       /*
-        * Stagger updates to ls->delta_fair. Very frequent updates
-        * can be expensive.
-        */
-       if (ls->delta_stat >= sysctl_sched_stat_granularity)
-               __update_curr_load(rq, ls);
-}
-
 /*
  * To aid in avoiding the subversion of "niceness" due to uneven distribution
  * of tasks with abnormal "nice" values across CPUs the contribution that
@@ -768,32 +728,6 @@ static const u32 prio_to_wmult[40] = {
 /*  15 */ 119304647, 148102320, 186737708, 238609294, 286331153,
 };
 
-static inline void
-inc_load(struct rq *rq, const struct task_struct *p, u64 now)
-{
-       update_curr_load(rq, now);
-       update_load_add(&rq->ls.load, p->se.load.weight);
-}
-
-static inline void
-dec_load(struct rq *rq, const struct task_struct *p, u64 now)
-{
-       update_curr_load(rq, now);
-       update_load_sub(&rq->ls.load, p->se.load.weight);
-}
-
-static void inc_nr_running(struct task_struct *p, struct rq *rq, u64 now)
-{
-       rq->nr_running++;
-       inc_load(rq, p, now);
-}
-
-static void dec_nr_running(struct task_struct *p, struct rq *rq, u64 now)
-{
-       rq->nr_running--;
-       dec_load(rq, p, now);
-}
-
 static void activate_task(struct rq *rq, struct task_struct *p, int wakeup);
 
 /*
@@ -824,6 +758,72 @@ static int balance_tasks(struct rq *this_rq, int this_cpu, struct rq *busiest,
 
 #define sched_class_highest (&rt_sched_class)
 
+static void __update_curr_load(struct rq *rq, struct load_stat *ls)
+{
+       if (rq->curr != rq->idle && ls->load.weight) {
+               ls->delta_exec += ls->delta_stat;
+               ls->delta_fair += calc_delta_fair(ls->delta_stat, &ls->load);
+               ls->delta_stat = 0;
+       }
+}
+
+/*
+ * Update delta_exec, delta_fair fields for rq.
+ *
+ * delta_fair clock advances at a rate inversely proportional to
+ * total load (rq->ls.load.weight) on the runqueue, while
+ * delta_exec advances at the same rate as wall-clock (provided
+ * cpu is not idle).
+ *
+ * delta_exec / delta_fair is a measure of the (smoothened) load on this
+ * runqueue over any given interval. This (smoothened) load is used
+ * during load balance.
+ *
+ * This function is called /before/ updating rq->ls.load
+ * and when switching tasks.
+ */
+static void update_curr_load(struct rq *rq, u64 now)
+{
+       struct load_stat *ls = &rq->ls;
+       u64 start;
+
+       start = ls->load_update_start;
+       ls->load_update_start = now;
+       ls->delta_stat += now - start;
+       /*
+        * Stagger updates to ls->delta_fair. Very frequent updates
+        * can be expensive.
+        */
+       if (ls->delta_stat >= sysctl_sched_stat_granularity)
+               __update_curr_load(rq, ls);
+}
+
+static inline void
+inc_load(struct rq *rq, const struct task_struct *p, u64 now)
+{
+       update_curr_load(rq, now);
+       update_load_add(&rq->ls.load, p->se.load.weight);
+}
+
+static inline void
+dec_load(struct rq *rq, const struct task_struct *p, u64 now)
+{
+       update_curr_load(rq, now);
+       update_load_sub(&rq->ls.load, p->se.load.weight);
+}
+
+static void inc_nr_running(struct task_struct *p, struct rq *rq, u64 now)
+{
+       rq->nr_running++;
+       inc_load(rq, p, now);
+}
+
+static void dec_nr_running(struct task_struct *p, struct rq *rq, u64 now)
+{
+       rq->nr_running--;
+       dec_load(rq, p, now);
+}
+
 static void set_load_weight(struct task_struct *p)
 {
        task_rq(p)->cfs.wait_runtime -= p->se.wait_runtime;