Two new files. This is kind of ugly code, but I want to go ahead and make
authorHavoc Pennington <hp@pobox.com>
Wed, 2 Dec 1998 20:20:35 +0000 (20:20 +0000)
committerHavoc Pennington <hp@src.gnome.org>
Wed, 2 Dec 1998 20:20:35 +0000 (20:20 +0000)
1998-12-02  Havoc Pennington  <hp@pobox.com>

* testgdate.c, testgdateparser.c: Two new files. This is kind of
ugly code, but I want to go ahead and make the tests available.
It isn't contaminating any other code. :-) Since one of these
is interactive and the other takes a while to run, I've kept
them separate from testglib for now.
* Makefile.am: Build gdate test programs.

12 files changed:
ChangeLog
ChangeLog.pre-2-0
ChangeLog.pre-2-10
ChangeLog.pre-2-12
ChangeLog.pre-2-2
ChangeLog.pre-2-4
ChangeLog.pre-2-6
ChangeLog.pre-2-8
testgdate.c [new file with mode: 0644]
testgdateparser.c [new file with mode: 0644]
tests/testgdate.c [new file with mode: 0644]
tests/testgdateparser.c [new file with mode: 0644]

index 2972275..3d03258 100644 (file)
--- a/ChangeLog
+++ b/ChangeLog
@@ -1,5 +1,14 @@
 1998-12-02  Havoc Pennington  <hp@pobox.com>
 
+       * testgdate.c, testgdateparser.c: Two new files. This is kind of 
+       ugly code, but I want to go ahead and make the tests available. 
+       It isn't contaminating any other code. :-) Since one of these 
+       is interactive and the other takes a while to run, I've kept 
+       them separate from testglib for now.
+       * Makefile.am: Build gdate test programs.
+       
+1998-12-02  Havoc Pennington  <hp@pobox.com>
+
        * gdate.c (g_date_valid): Rely on GDate::dmy and GDate::Julian
        flags, rather than re-checking the validity of the actual
        values. This should be the correct behavior, the old way was
index 2972275..3d03258 100644 (file)
@@ -1,5 +1,14 @@
 1998-12-02  Havoc Pennington  <hp@pobox.com>
 
+       * testgdate.c, testgdateparser.c: Two new files. This is kind of 
+       ugly code, but I want to go ahead and make the tests available. 
+       It isn't contaminating any other code. :-) Since one of these 
+       is interactive and the other takes a while to run, I've kept 
+       them separate from testglib for now.
+       * Makefile.am: Build gdate test programs.
+       
+1998-12-02  Havoc Pennington  <hp@pobox.com>
+
        * gdate.c (g_date_valid): Rely on GDate::dmy and GDate::Julian
        flags, rather than re-checking the validity of the actual
        values. This should be the correct behavior, the old way was
index 2972275..3d03258 100644 (file)
@@ -1,5 +1,14 @@
 1998-12-02  Havoc Pennington  <hp@pobox.com>
 
+       * testgdate.c, testgdateparser.c: Two new files. This is kind of 
+       ugly code, but I want to go ahead and make the tests available. 
+       It isn't contaminating any other code. :-) Since one of these 
+       is interactive and the other takes a while to run, I've kept 
+       them separate from testglib for now.
+       * Makefile.am: Build gdate test programs.
+       
+1998-12-02  Havoc Pennington  <hp@pobox.com>
+
        * gdate.c (g_date_valid): Rely on GDate::dmy and GDate::Julian
        flags, rather than re-checking the validity of the actual
        values. This should be the correct behavior, the old way was
index 2972275..3d03258 100644 (file)
@@ -1,5 +1,14 @@
 1998-12-02  Havoc Pennington  <hp@pobox.com>
 
+       * testgdate.c, testgdateparser.c: Two new files. This is kind of 
+       ugly code, but I want to go ahead and make the tests available. 
+       It isn't contaminating any other code. :-) Since one of these 
+       is interactive and the other takes a while to run, I've kept 
+       them separate from testglib for now.
+       * Makefile.am: Build gdate test programs.
+       
+1998-12-02  Havoc Pennington  <hp@pobox.com>
+
        * gdate.c (g_date_valid): Rely on GDate::dmy and GDate::Julian
        flags, rather than re-checking the validity of the actual
        values. This should be the correct behavior, the old way was
index 2972275..3d03258 100644 (file)
@@ -1,5 +1,14 @@
 1998-12-02  Havoc Pennington  <hp@pobox.com>
 
+       * testgdate.c, testgdateparser.c: Two new files. This is kind of 
+       ugly code, but I want to go ahead and make the tests available. 
+       It isn't contaminating any other code. :-) Since one of these 
+       is interactive and the other takes a while to run, I've kept 
+       them separate from testglib for now.
+       * Makefile.am: Build gdate test programs.
+       
+1998-12-02  Havoc Pennington  <hp@pobox.com>
+
        * gdate.c (g_date_valid): Rely on GDate::dmy and GDate::Julian
        flags, rather than re-checking the validity of the actual
        values. This should be the correct behavior, the old way was
index 2972275..3d03258 100644 (file)
@@ -1,5 +1,14 @@
 1998-12-02  Havoc Pennington  <hp@pobox.com>
 
+       * testgdate.c, testgdateparser.c: Two new files. This is kind of 
+       ugly code, but I want to go ahead and make the tests available. 
+       It isn't contaminating any other code. :-) Since one of these 
+       is interactive and the other takes a while to run, I've kept 
+       them separate from testglib for now.
+       * Makefile.am: Build gdate test programs.
+       
+1998-12-02  Havoc Pennington  <hp@pobox.com>
+
        * gdate.c (g_date_valid): Rely on GDate::dmy and GDate::Julian
        flags, rather than re-checking the validity of the actual
        values. This should be the correct behavior, the old way was
index 2972275..3d03258 100644 (file)
@@ -1,5 +1,14 @@
 1998-12-02  Havoc Pennington  <hp@pobox.com>
 
+       * testgdate.c, testgdateparser.c: Two new files. This is kind of 
+       ugly code, but I want to go ahead and make the tests available. 
+       It isn't contaminating any other code. :-) Since one of these 
+       is interactive and the other takes a while to run, I've kept 
+       them separate from testglib for now.
+       * Makefile.am: Build gdate test programs.
+       
+1998-12-02  Havoc Pennington  <hp@pobox.com>
+
        * gdate.c (g_date_valid): Rely on GDate::dmy and GDate::Julian
        flags, rather than re-checking the validity of the actual
        values. This should be the correct behavior, the old way was
index 2972275..3d03258 100644 (file)
@@ -1,5 +1,14 @@
 1998-12-02  Havoc Pennington  <hp@pobox.com>
 
+       * testgdate.c, testgdateparser.c: Two new files. This is kind of 
+       ugly code, but I want to go ahead and make the tests available. 
+       It isn't contaminating any other code. :-) Since one of these 
+       is interactive and the other takes a while to run, I've kept 
+       them separate from testglib for now.
+       * Makefile.am: Build gdate test programs.
+       
+1998-12-02  Havoc Pennington  <hp@pobox.com>
+
        * gdate.c (g_date_valid): Rely on GDate::dmy and GDate::Julian
        flags, rather than re-checking the validity of the actual
        values. This should be the correct behavior, the old way was
diff --git a/testgdate.c b/testgdate.c
new file mode 100644 (file)
index 0000000..25e8b15
--- /dev/null
@@ -0,0 +1,489 @@
+
+#include "glib.h"
+
+#include <stdio.h>
+#include <string.h>
+#include <locale.h>
+#include <time.h>
+
+gboolean failed = FALSE;
+guint32 passed = 0;
+guint32 notpassed = 0;
+
+#define        TEST(m,cond)    G_STMT_START { failed = !(cond); \
+if (failed) \
+  { ++notpassed; \
+    if (!m) \
+      g_print ("\n(%s:%d) failed for: %s\n", __FILE__, __LINE__, ( # cond )); \
+    else \
+      g_print ("\n(%s:%d) failed for: %s: (%s)\n", __FILE__, __LINE__, ( # cond ), (gchar*)m); \
+  } \
+else \
+  ++passed;    \
+  if ((passed+notpassed) % 10000 == 0) g_print ("."); fflush (stdout); \
+} G_STMT_END
+
+void g_date_debug_print(GDate* d)
+{
+  if (!d) g_print("NULL!\n");
+  else 
+    g_print("julian: %u (%s) DMY: %u %u %u (%s)\n",
+           d->julian_days, 
+           d->julian ? "valid" : "invalid",
+           d->day,
+           d->month,
+           d->year,
+           d->dmy ? "valid" : "invalid");
+  
+  fflush(stdout);
+}
+
+int main(int argc, char** argv)
+{
+  GDate* d;
+  guint32 j;
+  GDateMonth m;
+  GDateYear y, prev_y;
+  GDateDay day;
+  gchar buf[101];
+  gchar* loc;
+
+  /* Try to get all the leap year cases. */
+  GDateYear check_years[] = { 
+    1, 2, 3, 4, 5, 6, 7, 8, 9, 10,
+    11, 12, 13, 14, 98, 99, 100, 101, 102, 103, 397, 
+    398, 399, 400, 401, 402, 403, 404, 405, 406,
+    1598, 1599, 1600, 1601, 1602, 1650, 1651,
+    1897, 1898, 1899, 1900, 1901, 1902, 1903, 
+    1961, 1962, 1963, 1964, 1965, 1967,
+    1968, 1969, 1970, 1971, 1972, 1973, 1974, 1975, 1976,
+    1977, 1978, 1979, 1980, 1981, 1982, 1983, 1984, 1985, 
+    1986, 1987, 1988, 1989, 1990, 1991, 1992, 1993, 1994, 
+    1995, 1996, 1997, 1998, 1999, 2000, 2001, 2002, 2003, 
+    2004, 2005, 2006, 2007, 2008, 2009, 2010, 2011, 2012,
+    3000, 3001, 3002, 3998, 3999, 4000, 4001, 4002, 4003
+  };
+                           
+  guint n_check_years = sizeof(check_years)/sizeof(GDateYear);
+
+  guint i = 0;
+  gboolean discontinuity = FALSE;
+
+  g_print("checking GDate...");
+  
+  TEST("sizeof(GDate) is not more than 8 bytes on this platform", sizeof(GDate) < 9);
+
+  d = g_date_new();
+
+  TEST("Empty constructor produces invalid date", !g_date_valid(d));
+
+  g_date_free(d);
+
+  d = g_date_new_dmy(1,1,1);
+
+  TEST("January 1, Year 1 created and valid", g_date_valid(d));
+
+  j = g_date_julian(d);
+  
+  TEST("January 1, Year 1 is Julian date 1", j == 1);
+
+  TEST("Returned month is January", g_date_month(d) == G_DATE_JANUARY);
+  TEST("Returned day is 1", g_date_day(d) == 1);
+  TEST("Returned year is 1", g_date_year(d) == 1);
+
+  TEST("Bad month is invalid", !g_date_valid_month(G_DATE_BAD_MONTH));
+  TEST("Month 13 is invalid",  !g_date_valid_month(13));
+  TEST("Bad day is invalid",   !g_date_valid_day(G_DATE_BAD_DAY));
+  TEST("Day 32 is invalid",     !g_date_valid_day(32));
+  TEST("Bad year is invalid",  !g_date_valid_year(G_DATE_BAD_YEAR));
+  TEST("Bad julian is invalid", !g_date_valid_julian(G_DATE_BAD_JULIAN));
+  TEST("Bad weekday is invalid", !g_date_valid_weekday(G_DATE_BAD_WEEKDAY));
+  TEST("Year 2000 is a leap year", g_date_is_leap_year(2000));
+  TEST("Year 1999 is not a leap year", !g_date_is_leap_year(1999));
+  TEST("Year 1996 is a leap year", g_date_is_leap_year(1996));
+  TEST("Year 1600 is a leap year", g_date_is_leap_year(1600));
+  TEST("Year 2100 is not a leap year", !g_date_is_leap_year(2100));
+  TEST("Year 1800 is not a leap year", !g_date_is_leap_year(1800));
+
+  g_date_free(d);
+  
+  loc = setlocale(LC_ALL,"");
+  if (loc) 
+    g_print("\nLocale set to %s\n", loc);
+  else 
+    g_print("\nLocale unchanged\n");
+
+  d = g_date_new();
+  g_date_set_time(d, time(NULL));
+  TEST("Today is valid", g_date_valid(d));
+
+  g_date_strftime(buf,100,"Today is a %A, %x\n", d);
+  g_print("%s", buf);
+
+  g_date_set_time(d, 1);
+  TEST("Beginning of Unix epoch is valid", g_date_valid(d));
+
+  g_date_strftime(buf,100,"1 second into the Unix epoch it was a %A, in the month of %B, %x\n", d);
+  g_print("%s", buf);
+
+  g_date_set_julian(d, 1);
+  TEST("GDate's \"Julian\" epoch's first day is valid", g_date_valid(d));
+
+  g_date_strftime(buf,100,"Our \"Julian\" epoch begins on a %A, in the month of %B, %x\n",
+                 d);
+  g_print("%s", buf);
+
+  g_date_set_dmy(d, 10, 1, 2000);
+
+  g_date_strftime(buf,100,"%x", d);
+
+  g_date_set_parse(d, buf);
+  /* Note: this test will hopefully work, but no promises. */
+  TEST("Successfully parsed a %x-formatted string", 
+       g_date_valid(d) && 
+       g_date_month(d) == 1 && 
+       g_date_day(d) == 10 && 
+       g_date_year(d) == 2000);
+  if (failed)
+    g_date_debug_print(d);
+  
+  g_date_free(d);
+
+  j = G_DATE_BAD_JULIAN;
+
+  i = 0;
+  discontinuity = TRUE;
+  y      = check_years[0];
+  prev_y = G_DATE_BAD_YEAR;
+  while (i < n_check_years) 
+    {
+      guint32 first_day_of_year = G_DATE_BAD_JULIAN;
+      guint16 days_in_year = g_date_is_leap_year(y) ? 366 : 365;
+      guint   sunday_week_of_year = 0;
+      guint   sunday_weeks_in_year = g_date_sunday_weeks_in_year(y);
+      guint   monday_week_of_year = 0;
+      guint   monday_weeks_in_year = g_date_monday_weeks_in_year(y);
+
+      if (discontinuity)
+        g_print(" (Break in sequence of requested years to check)\n");
+
+      g_print("Checking year %u", y);
+
+      TEST("Year is valid", g_date_valid_year(y));
+
+      TEST("Number of Sunday weeks in year is 52 or 53", 
+          sunday_weeks_in_year == 52 || sunday_weeks_in_year == 53);
+      
+      TEST("Number of Monday weeks in year is 52 or 53", 
+          monday_weeks_in_year == 52 || monday_weeks_in_year == 53);
+          
+      m = 1;
+      while (m < 13) 
+       {
+         guint8 dim = g_date_days_in_month(m,y);
+         GDate days[31];         /* This is the fast way, no allocation */
+
+         TEST("Sensible number of days in month", (dim > 0 && dim < 32));
+
+         TEST("Month between 1 and 12 is valid", g_date_valid_month(m));
+
+         day = 1;
+
+         g_date_clear(days, 31);
+
+         while (day <= dim) 
+           {
+             guint i;
+              GDate tmp;
+
+             TEST("DMY triplet is valid", g_date_valid_dmy(day,m,y));
+
+             /* Create GDate with triplet */
+             
+             d = &days[day-1];
+
+             TEST("Cleared day is invalid", !g_date_valid(d));
+
+             g_date_set_dmy(d,day,m,y);
+
+             TEST("Set day is valid", g_date_valid(d));
+
+             if (m == G_DATE_JANUARY && day == 1) 
+               {
+                 first_day_of_year = g_date_julian(d);
+               }
+
+             g_assert(first_day_of_year != G_DATE_BAD_JULIAN);
+
+             TEST("Date with DMY triplet is valid", g_date_valid(d));
+             TEST("Month accessor works", g_date_month(d) == m);
+             TEST("Year accessor works", g_date_year(d) == y);
+             TEST("Day of month accessor works", g_date_day(d) == day);
+
+             TEST("Day of year is consistent with Julian dates",
+                  ((g_date_julian(d) + 1 - first_day_of_year) ==
+                   (g_date_day_of_year(d))));
+
+             if (failed) 
+               {
+                 g_print("first day: %u this day: %u day of year: %u\n", 
+                         first_day_of_year, 
+                         g_date_julian(d),
+                         g_date_day_of_year(d));
+               }
+             
+             if (m == G_DATE_DECEMBER && day == 31) 
+               {
+                 TEST("Last day of year equals number of days in year", 
+                      g_date_day_of_year(d) == days_in_year);
+                 if (failed) 
+                   {
+                     g_print("last day: %u days in year: %u\n", 
+                             g_date_day_of_year(d), days_in_year);
+                   }
+               }
+
+             TEST("Day of year is not more than number of days in the year",
+                  g_date_day_of_year(d) <= days_in_year);
+
+             TEST("Monday week of year is not more than number of weeks in the year",
+                  g_date_monday_week_of_year(d) <= monday_weeks_in_year);
+             if (failed)
+               {
+                 g_print("Weeks in year: %u\n", monday_weeks_in_year);
+                 g_date_debug_print(d);
+               }
+             TEST("Monday week of year is >= than last week of year",
+                  g_date_monday_week_of_year(d) >= monday_week_of_year);
+
+             if (g_date_weekday(d) == G_DATE_MONDAY) 
+               {
+                 
+                 TEST("Monday week of year on Monday 1 more than previous day's week of year",
+                      (g_date_monday_week_of_year(d) - monday_week_of_year) == 1);
+               }
+             else 
+               {
+                 TEST("Monday week of year on non-Monday 0 more than previous day's week of year",
+                      (g_date_monday_week_of_year(d) - monday_week_of_year) == 0);
+               }
+
+
+             monday_week_of_year = g_date_monday_week_of_year(d);
+
+
+             TEST("Sunday week of year is not more than number of weeks in the year",
+                  g_date_sunday_week_of_year(d) <= sunday_weeks_in_year);
+             if (failed)
+               {
+                 g_date_debug_print(d);
+               }
+             TEST("Sunday week of year is >= than last week of year",
+                  g_date_sunday_week_of_year(d) >= sunday_week_of_year);
+
+             if (g_date_weekday(d) == G_DATE_SUNDAY) 
+               {
+                 TEST("Sunday week of year on Sunday 1 more than previous day's week of year",
+                      (g_date_sunday_week_of_year(d) - sunday_week_of_year) == 1);
+               }
+             else 
+               {
+                 TEST("Sunday week of year on non-Sunday 0 more than previous day's week of year",
+                      (g_date_sunday_week_of_year(d) - sunday_week_of_year) == 0);
+               }
+
+             sunday_week_of_year = g_date_sunday_week_of_year(d);
+
+             TEST("Date is equal to itself",
+                  g_date_compare(d,d) == 0);
+
+
+             /*************** Increments ***********/
+
+              i = 1;
+              while (i < 402) /* Need to get 400 year increments in */ 
+                {
+             
+                  /***** Days ******/
+                  tmp = *d;
+                  g_date_add_days(d, i);
+
+                  TEST("Adding days gives a value greater than previous",
+                       g_date_compare(d, &tmp) > 0);
+
+                  g_date_subtract_days(d, i);
+                  TEST("Forward days then backward days returns us to current day",
+                       g_date_day(d) == day);
+
+                  if (failed) 
+                    {
+                      g_print("  (increment %u, dmy %u %u %u) ", i, day, m, y);
+                      g_date_debug_print(d);
+                    }
+
+                  TEST("Forward days then backward days returns us to current month",
+                       g_date_month(d) == m);
+
+                  if (failed) 
+                    {
+                      g_print("  (increment %u, dmy %u %u %u) ", i, day, m, y);
+                      g_date_debug_print(d);
+                    }
+
+                  TEST("Forward days then backward days returns us to current year",
+                       g_date_year(d) == y);
+
+                  if (failed) 
+                    {
+                      g_print("  (increment %u, dmy %u %u %u) ", i, day, m, y);
+                      g_date_debug_print(d);
+                    }
+
+                  /******* Months ********/
+
+                  tmp = *d;
+                  g_date_add_months(d, i);
+                  TEST("Adding months gives a larger value",
+                       g_date_compare(d, &tmp) > 0);
+                  g_date_subtract_months(d, i);
+
+                  TEST("Forward months then backward months returns us to current month",
+                       g_date_month(d) == m);
+
+                  if (failed) 
+                    {
+                      g_print("  (increment %u, dmy %u %u %u) ", i, day, m, y);
+                      g_date_debug_print(d);
+                    }
+
+                  TEST("Forward months then backward months returns us to current year",
+                       g_date_year(d) == y);
+
+                  if (failed) 
+                    {
+                      g_print("  (increment %u, dmy %u %u %u) ", i, day, m, y);
+                      g_date_debug_print(d);
+                    }
+
+                 
+                  if (day < 29) 
+                    {
+                      /* Day should be unchanged */
+                     
+                      TEST("Forward months then backward months returns us to current day",
+                           g_date_day(d) == day);
+                     
+                      if (failed) 
+                        {
+                          g_print("  (increment %u, dmy %u %u %u) ", i, day, m, y);
+                          g_date_debug_print(d);
+                        }
+                    }
+                  else 
+                    {
+                      /* reset the day for later tests */
+                      g_date_set_day(d, day);
+                    }
+
+                  /******* Years ********/
+
+                  tmp = *d;
+                  g_date_add_years(d, i);
+
+                  TEST("Adding years gives a larger value",
+                       g_date_compare(d,&tmp) > 0);
+                     
+                  g_date_subtract_years(d, i);
+
+                  TEST("Forward years then backward years returns us to current month",
+                       g_date_month(d) == m);
+
+                  if (failed) 
+                    {
+                      g_print("  (increment %u, dmy %u %u %u) ", i, day, m, y);
+                      g_date_debug_print(d);
+                    }
+
+                  TEST("Forward years then backward years returns us to current year",
+                       g_date_year(d) == y);
+
+                  if (failed) 
+                    {
+                      g_print("  (increment %u, dmy %u %u %u) ", i, day, m, y);
+                      g_date_debug_print(d);
+                    }
+
+                  if (m != 2 && day != 29) 
+                    {
+                      TEST("Forward years then backward years returns us to current day",
+                           g_date_day(d) == day);
+                     
+                      if (failed) 
+                        {
+                          g_print("  (increment %u, dmy %u %u %u) ", i, day, m, y);
+                          g_date_debug_print(d);
+                        }
+                    }
+                  else 
+                    {
+                      g_date_set_day(d, day); /* reset */
+                    }
+
+                  i += 10;
+                }
+
+             /*****  increment test relative to our local Julian count */
+
+              if (!discontinuity) {
+
+                /* We can only run sequence tests between sequential years */
+                
+                TEST("Julians are sequential with increment 1",
+                     j+1 == g_date_julian(d));
+                if (failed) 
+                  {
+                    g_print("Out of sequence, prev: %u expected: %u got: %u\n",
+                            j, j+1, g_date_julian(d));
+                  }
+
+                g_date_add_days(d,1);
+                TEST("Next day has julian 1 higher",
+                     g_date_julian(d) == j + 2);
+                g_date_subtract_days(d, 1);
+                
+                if (j != G_DATE_BAD_JULIAN) 
+                  {
+                    g_date_subtract_days(d, 1);
+                    
+                    TEST("Previous day has julian 1 lower",
+                         g_date_julian(d) == j);
+                    
+                    g_date_add_days(d, 1); /* back to original */
+                  }
+              }    
+              discontinuity = FALSE; /* goes away now */            
+
+              fflush(stdout);
+              fflush(stderr);
+
+             j = g_date_julian(d); /* inc current julian */
+
+             ++day;
+           } 
+         ++m;
+       }
+      g_print(" done\n");
+      ++i;
+      prev_y = y;
+      y = check_years[i];
+      if (prev_y == G_DATE_BAD_YEAR || 
+          (prev_y + 1) != y) discontinuity = TRUE;
+    }
+  
+  
+  g_print("\n%u tests passed, %u failed\n",passed, notpassed);
+
+  return 0;
+}
+
+
diff --git a/testgdateparser.c b/testgdateparser.c
new file mode 100644 (file)
index 0000000..1e482ff
--- /dev/null
@@ -0,0 +1,109 @@
+
+#include "glib.h"
+
+#include <stdio.h>
+#include <string.h>
+#include <locale.h>
+
+void g_date_debug_print(GDate* d)
+{
+  if (!d) g_print("NULL!\n");
+  else 
+    g_print("julian: %u (%s) DMY: %u %u %u (%s)\n",
+           d->julian_days, 
+           d->julian ? "valid" : "invalid",
+           d->day,
+           d->month,
+           d->year,
+           d->dmy ? "valid" : "invalid");
+  
+  fflush(stdout);
+}
+
+/* These only work in the POSIX locale, maybe C too - 
+ * type POSIX into the program to check them
+ */
+char* posix_tests [] = {
+  "19981024",
+  "981024",
+  "October 1998",
+  "October 98",
+  "oCT 98",
+  "10/24/98",
+  "10 -- 24 -- 98",
+  "10/24/1998",
+  "October 24, 1998",
+  NULL
+};
+
+int main(int argc, char** argv)
+{
+  GDate* d;
+  gchar* loc;
+  gchar input[1024];
+
+  loc = setlocale(LC_ALL,"");
+  if (loc) 
+    g_print("\nLocale set to %s\n", loc);
+  else 
+    g_print("\nLocale unchanged\n");
+
+  d = g_date_new();
+
+  while (fgets(input, 1023, stdin))
+    {
+      if (input[0] == '\n') 
+        {
+          g_print("Enter a date to parse and press enter, or type `POSIX':\n");
+          continue;
+        }
+
+      if (strcmp(input,"POSIX\n") == 0) 
+        {
+          char** s = posix_tests;
+          while (*s) {
+            g_date_set_parse(d, *s);
+            
+            g_print("POSIXy parse test `%s' ...", *s);
+
+            if (!g_date_valid(d))
+              {
+                g_print(" failed.\n");
+              }
+            else 
+              {
+                gchar buf[256];
+                
+                g_date_strftime(buf,100," parsed `%x' (%B %d %Y)\n",
+                                d);
+                g_print("%s", buf);
+              }
+
+            ++s;
+          }
+        }
+      else 
+        {
+          g_date_set_parse(d, input);
+          
+          if (!g_date_valid(d))
+            {
+              g_print("Parse failed.\n");
+            }
+          else 
+            {
+              gchar buf[256];
+              
+              g_date_strftime(buf,100,"Parsed: `%x' (%B %d %Y)\n",
+                              d);
+              g_print("%s", buf);
+            }
+        }
+    }
+
+  g_date_free(d);
+
+  return 0;
+}
+
+
diff --git a/tests/testgdate.c b/tests/testgdate.c
new file mode 100644 (file)
index 0000000..25e8b15
--- /dev/null
@@ -0,0 +1,489 @@
+
+#include "glib.h"
+
+#include <stdio.h>
+#include <string.h>
+#include <locale.h>
+#include <time.h>
+
+gboolean failed = FALSE;
+guint32 passed = 0;
+guint32 notpassed = 0;
+
+#define        TEST(m,cond)    G_STMT_START { failed = !(cond); \
+if (failed) \
+  { ++notpassed; \
+    if (!m) \
+      g_print ("\n(%s:%d) failed for: %s\n", __FILE__, __LINE__, ( # cond )); \
+    else \
+      g_print ("\n(%s:%d) failed for: %s: (%s)\n", __FILE__, __LINE__, ( # cond ), (gchar*)m); \
+  } \
+else \
+  ++passed;    \
+  if ((passed+notpassed) % 10000 == 0) g_print ("."); fflush (stdout); \
+} G_STMT_END
+
+void g_date_debug_print(GDate* d)
+{
+  if (!d) g_print("NULL!\n");
+  else 
+    g_print("julian: %u (%s) DMY: %u %u %u (%s)\n",
+           d->julian_days, 
+           d->julian ? "valid" : "invalid",
+           d->day,
+           d->month,
+           d->year,
+           d->dmy ? "valid" : "invalid");
+  
+  fflush(stdout);
+}
+
+int main(int argc, char** argv)
+{
+  GDate* d;
+  guint32 j;
+  GDateMonth m;
+  GDateYear y, prev_y;
+  GDateDay day;
+  gchar buf[101];
+  gchar* loc;
+
+  /* Try to get all the leap year cases. */
+  GDateYear check_years[] = { 
+    1, 2, 3, 4, 5, 6, 7, 8, 9, 10,
+    11, 12, 13, 14, 98, 99, 100, 101, 102, 103, 397, 
+    398, 399, 400, 401, 402, 403, 404, 405, 406,
+    1598, 1599, 1600, 1601, 1602, 1650, 1651,
+    1897, 1898, 1899, 1900, 1901, 1902, 1903, 
+    1961, 1962, 1963, 1964, 1965, 1967,
+    1968, 1969, 1970, 1971, 1972, 1973, 1974, 1975, 1976,
+    1977, 1978, 1979, 1980, 1981, 1982, 1983, 1984, 1985, 
+    1986, 1987, 1988, 1989, 1990, 1991, 1992, 1993, 1994, 
+    1995, 1996, 1997, 1998, 1999, 2000, 2001, 2002, 2003, 
+    2004, 2005, 2006, 2007, 2008, 2009, 2010, 2011, 2012,
+    3000, 3001, 3002, 3998, 3999, 4000, 4001, 4002, 4003
+  };
+                           
+  guint n_check_years = sizeof(check_years)/sizeof(GDateYear);
+
+  guint i = 0;
+  gboolean discontinuity = FALSE;
+
+  g_print("checking GDate...");
+  
+  TEST("sizeof(GDate) is not more than 8 bytes on this platform", sizeof(GDate) < 9);
+
+  d = g_date_new();
+
+  TEST("Empty constructor produces invalid date", !g_date_valid(d));
+
+  g_date_free(d);
+
+  d = g_date_new_dmy(1,1,1);
+
+  TEST("January 1, Year 1 created and valid", g_date_valid(d));
+
+  j = g_date_julian(d);
+  
+  TEST("January 1, Year 1 is Julian date 1", j == 1);
+
+  TEST("Returned month is January", g_date_month(d) == G_DATE_JANUARY);
+  TEST("Returned day is 1", g_date_day(d) == 1);
+  TEST("Returned year is 1", g_date_year(d) == 1);
+
+  TEST("Bad month is invalid", !g_date_valid_month(G_DATE_BAD_MONTH));
+  TEST("Month 13 is invalid",  !g_date_valid_month(13));
+  TEST("Bad day is invalid",   !g_date_valid_day(G_DATE_BAD_DAY));
+  TEST("Day 32 is invalid",     !g_date_valid_day(32));
+  TEST("Bad year is invalid",  !g_date_valid_year(G_DATE_BAD_YEAR));
+  TEST("Bad julian is invalid", !g_date_valid_julian(G_DATE_BAD_JULIAN));
+  TEST("Bad weekday is invalid", !g_date_valid_weekday(G_DATE_BAD_WEEKDAY));
+  TEST("Year 2000 is a leap year", g_date_is_leap_year(2000));
+  TEST("Year 1999 is not a leap year", !g_date_is_leap_year(1999));
+  TEST("Year 1996 is a leap year", g_date_is_leap_year(1996));
+  TEST("Year 1600 is a leap year", g_date_is_leap_year(1600));
+  TEST("Year 2100 is not a leap year", !g_date_is_leap_year(2100));
+  TEST("Year 1800 is not a leap year", !g_date_is_leap_year(1800));
+
+  g_date_free(d);
+  
+  loc = setlocale(LC_ALL,"");
+  if (loc) 
+    g_print("\nLocale set to %s\n", loc);
+  else 
+    g_print("\nLocale unchanged\n");
+
+  d = g_date_new();
+  g_date_set_time(d, time(NULL));
+  TEST("Today is valid", g_date_valid(d));
+
+  g_date_strftime(buf,100,"Today is a %A, %x\n", d);
+  g_print("%s", buf);
+
+  g_date_set_time(d, 1);
+  TEST("Beginning of Unix epoch is valid", g_date_valid(d));
+
+  g_date_strftime(buf,100,"1 second into the Unix epoch it was a %A, in the month of %B, %x\n", d);
+  g_print("%s", buf);
+
+  g_date_set_julian(d, 1);
+  TEST("GDate's \"Julian\" epoch's first day is valid", g_date_valid(d));
+
+  g_date_strftime(buf,100,"Our \"Julian\" epoch begins on a %A, in the month of %B, %x\n",
+                 d);
+  g_print("%s", buf);
+
+  g_date_set_dmy(d, 10, 1, 2000);
+
+  g_date_strftime(buf,100,"%x", d);
+
+  g_date_set_parse(d, buf);
+  /* Note: this test will hopefully work, but no promises. */
+  TEST("Successfully parsed a %x-formatted string", 
+       g_date_valid(d) && 
+       g_date_month(d) == 1 && 
+       g_date_day(d) == 10 && 
+       g_date_year(d) == 2000);
+  if (failed)
+    g_date_debug_print(d);
+  
+  g_date_free(d);
+
+  j = G_DATE_BAD_JULIAN;
+
+  i = 0;
+  discontinuity = TRUE;
+  y      = check_years[0];
+  prev_y = G_DATE_BAD_YEAR;
+  while (i < n_check_years) 
+    {
+      guint32 first_day_of_year = G_DATE_BAD_JULIAN;
+      guint16 days_in_year = g_date_is_leap_year(y) ? 366 : 365;
+      guint   sunday_week_of_year = 0;
+      guint   sunday_weeks_in_year = g_date_sunday_weeks_in_year(y);
+      guint   monday_week_of_year = 0;
+      guint   monday_weeks_in_year = g_date_monday_weeks_in_year(y);
+
+      if (discontinuity)
+        g_print(" (Break in sequence of requested years to check)\n");
+
+      g_print("Checking year %u", y);
+
+      TEST("Year is valid", g_date_valid_year(y));
+
+      TEST("Number of Sunday weeks in year is 52 or 53", 
+          sunday_weeks_in_year == 52 || sunday_weeks_in_year == 53);
+      
+      TEST("Number of Monday weeks in year is 52 or 53", 
+          monday_weeks_in_year == 52 || monday_weeks_in_year == 53);
+          
+      m = 1;
+      while (m < 13) 
+       {
+         guint8 dim = g_date_days_in_month(m,y);
+         GDate days[31];         /* This is the fast way, no allocation */
+
+         TEST("Sensible number of days in month", (dim > 0 && dim < 32));
+
+         TEST("Month between 1 and 12 is valid", g_date_valid_month(m));
+
+         day = 1;
+
+         g_date_clear(days, 31);
+
+         while (day <= dim) 
+           {
+             guint i;
+              GDate tmp;
+
+             TEST("DMY triplet is valid", g_date_valid_dmy(day,m,y));
+
+             /* Create GDate with triplet */
+             
+             d = &days[day-1];
+
+             TEST("Cleared day is invalid", !g_date_valid(d));
+
+             g_date_set_dmy(d,day,m,y);
+
+             TEST("Set day is valid", g_date_valid(d));
+
+             if (m == G_DATE_JANUARY && day == 1) 
+               {
+                 first_day_of_year = g_date_julian(d);
+               }
+
+             g_assert(first_day_of_year != G_DATE_BAD_JULIAN);
+
+             TEST("Date with DMY triplet is valid", g_date_valid(d));
+             TEST("Month accessor works", g_date_month(d) == m);
+             TEST("Year accessor works", g_date_year(d) == y);
+             TEST("Day of month accessor works", g_date_day(d) == day);
+
+             TEST("Day of year is consistent with Julian dates",
+                  ((g_date_julian(d) + 1 - first_day_of_year) ==
+                   (g_date_day_of_year(d))));
+
+             if (failed) 
+               {
+                 g_print("first day: %u this day: %u day of year: %u\n", 
+                         first_day_of_year, 
+                         g_date_julian(d),
+                         g_date_day_of_year(d));
+               }
+             
+             if (m == G_DATE_DECEMBER && day == 31) 
+               {
+                 TEST("Last day of year equals number of days in year", 
+                      g_date_day_of_year(d) == days_in_year);
+                 if (failed) 
+                   {
+                     g_print("last day: %u days in year: %u\n", 
+                             g_date_day_of_year(d), days_in_year);
+                   }
+               }
+
+             TEST("Day of year is not more than number of days in the year",
+                  g_date_day_of_year(d) <= days_in_year);
+
+             TEST("Monday week of year is not more than number of weeks in the year",
+                  g_date_monday_week_of_year(d) <= monday_weeks_in_year);
+             if (failed)
+               {
+                 g_print("Weeks in year: %u\n", monday_weeks_in_year);
+                 g_date_debug_print(d);
+               }
+             TEST("Monday week of year is >= than last week of year",
+                  g_date_monday_week_of_year(d) >= monday_week_of_year);
+
+             if (g_date_weekday(d) == G_DATE_MONDAY) 
+               {
+                 
+                 TEST("Monday week of year on Monday 1 more than previous day's week of year",
+                      (g_date_monday_week_of_year(d) - monday_week_of_year) == 1);
+               }
+             else 
+               {
+                 TEST("Monday week of year on non-Monday 0 more than previous day's week of year",
+                      (g_date_monday_week_of_year(d) - monday_week_of_year) == 0);
+               }
+
+
+             monday_week_of_year = g_date_monday_week_of_year(d);
+
+
+             TEST("Sunday week of year is not more than number of weeks in the year",
+                  g_date_sunday_week_of_year(d) <= sunday_weeks_in_year);
+             if (failed)
+               {
+                 g_date_debug_print(d);
+               }
+             TEST("Sunday week of year is >= than last week of year",
+                  g_date_sunday_week_of_year(d) >= sunday_week_of_year);
+
+             if (g_date_weekday(d) == G_DATE_SUNDAY) 
+               {
+                 TEST("Sunday week of year on Sunday 1 more than previous day's week of year",
+                      (g_date_sunday_week_of_year(d) - sunday_week_of_year) == 1);
+               }
+             else 
+               {
+                 TEST("Sunday week of year on non-Sunday 0 more than previous day's week of year",
+                      (g_date_sunday_week_of_year(d) - sunday_week_of_year) == 0);
+               }
+
+             sunday_week_of_year = g_date_sunday_week_of_year(d);
+
+             TEST("Date is equal to itself",
+                  g_date_compare(d,d) == 0);
+
+
+             /*************** Increments ***********/
+
+              i = 1;
+              while (i < 402) /* Need to get 400 year increments in */ 
+                {
+             
+                  /***** Days ******/
+                  tmp = *d;
+                  g_date_add_days(d, i);
+
+                  TEST("Adding days gives a value greater than previous",
+                       g_date_compare(d, &tmp) > 0);
+
+                  g_date_subtract_days(d, i);
+                  TEST("Forward days then backward days returns us to current day",
+                       g_date_day(d) == day);
+
+                  if (failed) 
+                    {
+                      g_print("  (increment %u, dmy %u %u %u) ", i, day, m, y);
+                      g_date_debug_print(d);
+                    }
+
+                  TEST("Forward days then backward days returns us to current month",
+                       g_date_month(d) == m);
+
+                  if (failed) 
+                    {
+                      g_print("  (increment %u, dmy %u %u %u) ", i, day, m, y);
+                      g_date_debug_print(d);
+                    }
+
+                  TEST("Forward days then backward days returns us to current year",
+                       g_date_year(d) == y);
+
+                  if (failed) 
+                    {
+                      g_print("  (increment %u, dmy %u %u %u) ", i, day, m, y);
+                      g_date_debug_print(d);
+                    }
+
+                  /******* Months ********/
+
+                  tmp = *d;
+                  g_date_add_months(d, i);
+                  TEST("Adding months gives a larger value",
+                       g_date_compare(d, &tmp) > 0);
+                  g_date_subtract_months(d, i);
+
+                  TEST("Forward months then backward months returns us to current month",
+                       g_date_month(d) == m);
+
+                  if (failed) 
+                    {
+                      g_print("  (increment %u, dmy %u %u %u) ", i, day, m, y);
+                      g_date_debug_print(d);
+                    }
+
+                  TEST("Forward months then backward months returns us to current year",
+                       g_date_year(d) == y);
+
+                  if (failed) 
+                    {
+                      g_print("  (increment %u, dmy %u %u %u) ", i, day, m, y);
+                      g_date_debug_print(d);
+                    }
+
+                 
+                  if (day < 29) 
+                    {
+                      /* Day should be unchanged */
+                     
+                      TEST("Forward months then backward months returns us to current day",
+                           g_date_day(d) == day);
+                     
+                      if (failed) 
+                        {
+                          g_print("  (increment %u, dmy %u %u %u) ", i, day, m, y);
+                          g_date_debug_print(d);
+                        }
+                    }
+                  else 
+                    {
+                      /* reset the day for later tests */
+                      g_date_set_day(d, day);
+                    }
+
+                  /******* Years ********/
+
+                  tmp = *d;
+                  g_date_add_years(d, i);
+
+                  TEST("Adding years gives a larger value",
+                       g_date_compare(d,&tmp) > 0);
+                     
+                  g_date_subtract_years(d, i);
+
+                  TEST("Forward years then backward years returns us to current month",
+                       g_date_month(d) == m);
+
+                  if (failed) 
+                    {
+                      g_print("  (increment %u, dmy %u %u %u) ", i, day, m, y);
+                      g_date_debug_print(d);
+                    }
+
+                  TEST("Forward years then backward years returns us to current year",
+                       g_date_year(d) == y);
+
+                  if (failed) 
+                    {
+                      g_print("  (increment %u, dmy %u %u %u) ", i, day, m, y);
+                      g_date_debug_print(d);
+                    }
+
+                  if (m != 2 && day != 29) 
+                    {
+                      TEST("Forward years then backward years returns us to current day",
+                           g_date_day(d) == day);
+                     
+                      if (failed) 
+                        {
+                          g_print("  (increment %u, dmy %u %u %u) ", i, day, m, y);
+                          g_date_debug_print(d);
+                        }
+                    }
+                  else 
+                    {
+                      g_date_set_day(d, day); /* reset */
+                    }
+
+                  i += 10;
+                }
+
+             /*****  increment test relative to our local Julian count */
+
+              if (!discontinuity) {
+
+                /* We can only run sequence tests between sequential years */
+                
+                TEST("Julians are sequential with increment 1",
+                     j+1 == g_date_julian(d));
+                if (failed) 
+                  {
+                    g_print("Out of sequence, prev: %u expected: %u got: %u\n",
+                            j, j+1, g_date_julian(d));
+                  }
+
+                g_date_add_days(d,1);
+                TEST("Next day has julian 1 higher",
+                     g_date_julian(d) == j + 2);
+                g_date_subtract_days(d, 1);
+                
+                if (j != G_DATE_BAD_JULIAN) 
+                  {
+                    g_date_subtract_days(d, 1);
+                    
+                    TEST("Previous day has julian 1 lower",
+                         g_date_julian(d) == j);
+                    
+                    g_date_add_days(d, 1); /* back to original */
+                  }
+              }    
+              discontinuity = FALSE; /* goes away now */            
+
+              fflush(stdout);
+              fflush(stderr);
+
+             j = g_date_julian(d); /* inc current julian */
+
+             ++day;
+           } 
+         ++m;
+       }
+      g_print(" done\n");
+      ++i;
+      prev_y = y;
+      y = check_years[i];
+      if (prev_y == G_DATE_BAD_YEAR || 
+          (prev_y + 1) != y) discontinuity = TRUE;
+    }
+  
+  
+  g_print("\n%u tests passed, %u failed\n",passed, notpassed);
+
+  return 0;
+}
+
+
diff --git a/tests/testgdateparser.c b/tests/testgdateparser.c
new file mode 100644 (file)
index 0000000..1e482ff
--- /dev/null
@@ -0,0 +1,109 @@
+
+#include "glib.h"
+
+#include <stdio.h>
+#include <string.h>
+#include <locale.h>
+
+void g_date_debug_print(GDate* d)
+{
+  if (!d) g_print("NULL!\n");
+  else 
+    g_print("julian: %u (%s) DMY: %u %u %u (%s)\n",
+           d->julian_days, 
+           d->julian ? "valid" : "invalid",
+           d->day,
+           d->month,
+           d->year,
+           d->dmy ? "valid" : "invalid");
+  
+  fflush(stdout);
+}
+
+/* These only work in the POSIX locale, maybe C too - 
+ * type POSIX into the program to check them
+ */
+char* posix_tests [] = {
+  "19981024",
+  "981024",
+  "October 1998",
+  "October 98",
+  "oCT 98",
+  "10/24/98",
+  "10 -- 24 -- 98",
+  "10/24/1998",
+  "October 24, 1998",
+  NULL
+};
+
+int main(int argc, char** argv)
+{
+  GDate* d;
+  gchar* loc;
+  gchar input[1024];
+
+  loc = setlocale(LC_ALL,"");
+  if (loc) 
+    g_print("\nLocale set to %s\n", loc);
+  else 
+    g_print("\nLocale unchanged\n");
+
+  d = g_date_new();
+
+  while (fgets(input, 1023, stdin))
+    {
+      if (input[0] == '\n') 
+        {
+          g_print("Enter a date to parse and press enter, or type `POSIX':\n");
+          continue;
+        }
+
+      if (strcmp(input,"POSIX\n") == 0) 
+        {
+          char** s = posix_tests;
+          while (*s) {
+            g_date_set_parse(d, *s);
+            
+            g_print("POSIXy parse test `%s' ...", *s);
+
+            if (!g_date_valid(d))
+              {
+                g_print(" failed.\n");
+              }
+            else 
+              {
+                gchar buf[256];
+                
+                g_date_strftime(buf,100," parsed `%x' (%B %d %Y)\n",
+                                d);
+                g_print("%s", buf);
+              }
+
+            ++s;
+          }
+        }
+      else 
+        {
+          g_date_set_parse(d, input);
+          
+          if (!g_date_valid(d))
+            {
+              g_print("Parse failed.\n");
+            }
+          else 
+            {
+              gchar buf[256];
+              
+              g_date_strftime(buf,100,"Parsed: `%x' (%B %d %Y)\n",
+                              d);
+              g_print("%s", buf);
+            }
+        }
+    }
+
+  g_date_free(d);
+
+  return 0;
+}
+
+