sched/topology: Set correct NUMA topology type
With the following commit:
051f3ca02e46 ("sched/topology: Introduce NUMA identity node sched domain")
the scheduler introduced a new NUMA level. However this leads to the NUMA topology
on 2 node systems to not be marked as NUMA_DIRECT anymore.
After this commit, it gets reported as NUMA_BACKPLANE, because
sched_domains_numa_level is now 2 on 2 node systems.
Fix this by allowing setting systems that have up to 2 NUMA levels as
NUMA_DIRECT.
While here remove code that assumes that level can be 0.
Signed-off-by: Srikar Dronamraju <srikar@linux.vnet.ibm.com>
Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org>
Cc: Andre Wild <wild@linux.vnet.ibm.com>
Cc: Heiko Carstens <heiko.carstens@de.ibm.com>
Cc: Linus Torvalds <torvalds@linux-foundation.org>
Cc: Mel Gorman <mgorman@techsingularity.net>
Cc: Michael Ellerman <mpe@ellerman.id.au>
Cc: Peter Zijlstra <peterz@infradead.org>
Cc: Rik van Riel <riel@surriel.com>
Cc: Suravee Suthikulpanit <suravee.suthikulpanit@amd.com>
Cc: Thomas Gleixner <tglx@linutronix.de>
Cc: linuxppc-dev <linuxppc-dev@lists.ozlabs.org>
Fixes:
051f3ca02e46 "Introduce NUMA identity node sched domain"
Link: http://lkml.kernel.org/r/1533920419-17410-1-git-send-email-srikar@linux.vnet.ibm.com
Signed-off-by: Ingo Molnar <mingo@kernel.org>