sched/deadline: Reduce rq lock contention by eliminating locking of non-feasible target
This patch adds a check that prevents futile attempts to move DL tasks
to a CPU with active tasks of equal or earlier deadline. The same
behavior as commit
80e3d87b2c55 ("sched/rt: Reduce rq lock contention
by eliminating locking of non-feasible target") for rt class.
Signed-off-by: Wanpeng Li <wanpeng.li@linux.intel.com>
Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org>
Cc: Andrew Morton <akpm@linux-foundation.org>
Cc: Borislav Petkov <bp@alien8.de>
Cc: H. Peter Anvin <hpa@zytor.com>
Cc: Juri Lelli <juri.lelli@arm.com>
Cc: Linus Torvalds <torvalds@linux-foundation.org>
Cc: Peter Zijlstra <peterz@infradead.org>
Cc: Thomas Gleixner <tglx@linutronix.de>
Link: http://lkml.kernel.org/r/1431496867-4194-3-git-send-email-wanpeng.li@linux.intel.com
Signed-off-by: Ingo Molnar <mingo@kernel.org>